10 yard
The 10 yard covers a basement or garage purge in Boulder and includes about 2 tons.

Boulder is a 30 yard market for us, built on remodel and construction debris, with 14 days typically included and deliveries reaching Golden, Westminster, Arvada and Longmont.
From $550* for a 30 yard
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
Quote in 30 seconds · open to 7pm
Pricing
Boulder prices below cover general debris only. Our From price is quoted on a 30 yard, the size ordered most here, while the 20 yard is the usual step down for lighter remodels and yard work.
| Size | Typical* | Tons included | Orders priced, 12 mo |
|---|---|---|---|
| 10 yard | $425 to $495* | 2 tons | 8 |
| 15 yard | $500 to $675* | 2 tons | 9 |
| 20 yard | $495 to $575* | 2 tons | 25 |
| 30 yard | $550 to $625* | 3 tons | 45 |
| 40 yard | $680 to $700* | 3.5 tons | 6 |
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
The From price is for a 30 yard. Other sizes are in the table.
A Boulder 10, 15 and 20 yard each include about 2 tons, a 30 yard about 3 and a 40 yard about 3.5, with 14 days typically included.
Weight past the allowance runs about $95 a ton on a 30 yard* in Boulder, and a day over adds about $20 on a 30 yard.
A Boulder delivery fee of about $50 on a 30 yard appears on its own line, separate from the container rate.
Sizes
Boulder orders run on the 30 yard, with the 20 yard close behind for remodels and yard work, and the 10, 15 and 40 yard boxes covering small, in-between and very large jobs.

The 10 yard covers a basement or garage purge in Boulder and includes about 2 tons.

A 15 yard bridges the small and mid-size jobs, such as a single-room remodel or a deck tear-off, with about 2 tons included.

The 20 yard is Boulder's second most ordered box, used for kitchen and bath remodels and yard cleanups, with about 2 tons included.

The 30 yard leads Boulder orders, taking whole-house renovations and household cleanouts, with about 3 tons included.

The 40 yard is the rare big box in Boulder, kept for large demolition or commercial-scale debris, and it includes about 3.5 tons.
Recent work
Construction and demolition debris made up 72 Boulder orders, household cleanouts made up 13, yard debris made up 3, and heavy loads such as concrete and dirt made up 2.
Source: Dumpster Rental Dogs orders by delivery date. Job type comes from the debris material on the order. Customer names withheld.
Weight and disposal
Boulder ties new building permits to a zero waste plan that recycles all clean lumber, metal and cardboard, and Boulder County's facility on 63rd Street takes the hazardous waste that stays out of the box.
| Topic | Rule |
|---|---|
| City of Boulder zero waste rules for building permits | For a full structure deconstruction permit, the city requires at least 75 percent of waste reused or recycled across at least three material types. For a new building permit it requires 100 percent of clean lumber, metal and cardboard reused or recycled. Applicants submit a waste diversion plan through Green Halo and upload weight tickets, with a final report due within 60 days of finishing. Source |
| Hazardous waste drop-off | Boulder County's Hazardous Materials Management Facility at 1901 63rd St takes hazardous waste from residents of Boulder County, Broomfield County and the Town of Erie. It is open Wednesday through Saturday, and business waste is accepted by appointment on Tuesday. Source 1 Source 2 |
| Unincorporated Boulder County jobsites | In unincorporated Boulder County, building demolition is prohibited and all buildings must be deconstructed. Jobsite waste including wood, scrap metal and concrete must be recycled, with labeled containers on site, and the county's licensing covers haulers of construction and demolition material. Source 1 Source 2 |
Hazardous waste belongs at Boulder County's facility on 63rd Street, not in the dumpster, and the city's zero waste plans call for clean lumber, metal and cardboard to be recycled.
Permits and rules
Boulder's right-of-way permit is applied for by a licensed contractor, and the city approves a dumpster in the street only when a spot off the right-of-way is not feasible.
| When | What you need | Lead time | Who to call |
|---|---|---|---|
| A construction dumpster placed in a street, alley or other public right-of-way | A right-of-way permit. City code bars a trash dumpster from the right-of-way unless the permit approves it, and the city approves one only when the applicant shows that placing it outside the right-of-way is not feasible. It lasts up to 30 days, then the box comes out or a new permit is issued for up to 30 more. The city fee is $98 plus $94 for a dumpster, from a 10 yard to a 40 yard box. Right-of-way work needs a traffic control plan. Source 1 Source 2 Source 3 | City of Boulder right-of-way permits, ROW@BoulderColorado.gov. Only a right-of-way licensed contractor may apply, and that contractor must be on site. |
The city's right-of-way pages do not address a dumpster kept on private property. A site outside city limits, such as Niwot or Golden, follows its own county or city office.
Weather and season
21.5°F
January lows at Boulder average 21.5°F, with about 138 nights a year at freezing. The last freeze usually comes near May 6 and the first returns around October 5, so frozen ground lingers well into spring.
88.0°F
July highs average 88.0°F, and about 33 days a year reach 90°F or hotter, so early loading beats the afternoon sun on a Boulder reroof or demolition day.
3.21 in
May is Boulder's wettest month at 3.21 inches, with April close behind at 3.05. Wet debris adds weight, so set the box on pavement and not on spring-soft lawn.
June
June is our busiest month in Boulder, with March and May close behind.
August
August is the quietest month in Boulder, and September and February stay slow as well.
Scheduling
Boulder drops typically go out about three days after the order, and about a quarter arrive within one day.
If a Boulder 30 yard* fills before the work does, a swap or haul-off is quoted separately, so raise it when you order.
Three days is the usual Boulder wait. If your start date is firm, call (303) 536-6999 and ask what the next truck can do.
Delivery area
Boulder, Golden, Westminster and Arvada take most deliveries, Denver and Longmont follow, and Thornton, Lafayette and Niwot each see the occasional drop, in zip codes such as 80401, 80234 and 80302.
Placement
Boulder allows a construction dumpster in the street or alley only with a right-of-way permit, and only when the city agrees that a spot on the property is not feasible, so a driveway comes first.
A driveway or lot on your own property is the easy answer in Boulder, because the city's right-of-way rules apply only to public street, alley and sidewalk space.
A Boulder street or alley spot needs a right-of-way permit, applied for by a licensed contractor, for up to 30 days. See permits
FAQs
These Boulder answers draw on the city's right-of-way and zero waste pages and Boulder County's hazardous waste facility, linked above, plus our last 12 months of local orders.
Boulder delivery usually takes about three days, and about a quarter of drops land within a day. The slower quarter wait about five days or more, so book early for a fixed start date.
A driveway or private lot is the easy choice, since the city's permit pages cover only the public right-of-way. A street or alley spot needs a right-of-way permit and a case that the lot has no room.
A Boulder street or alley placement takes a right-of-way permit for up to 30 days, applied for by a right-of-way licensed contractor who must be on site. Write ROW@BoulderColorado.gov with questions.
Boulder rentals typically include 14 days, and the usual box goes back after about a week. A street permit runs only 30 days, so plan long jobs around that.
A Boulder 10, 15 and 20 yard each include about 2 tons, a 30 yard about 3 and a 40 yard about 3.5, so a heavy demolition job is better matched to the larger boxes.
Boulder County's facility on 63rd Street takes household hazardous waste, so keep paint and chemicals out of the box, and ask us before you load concrete or dirt.
A Boulder 30 yard costs about $95 per ton past the allowance, and about $20 per day over on that 30 yard. Net 30 and extended terms are available for qualified contractor and business accounts.
When the box is full, call us to book the haul-off. For a street spot, remember the permit ends after 30 days, so line the pickup up inside that window.