
10 yard
In Columbus the 10 yard serves small household cleanouts, like the Reynoldsburg job below, and it typically includes about 2 tons.

Columbus leans toward business and contractor accounts, and the 30 yard does most of the heavy lifting, with 7 days typically included before extra days begin.
From $665* for a 30 yard
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
Quote in 30 seconds · open to 7pm
Pricing
Columbus ranges below reflect general debris. The 30 yard is the most common size here and carries our From price, with the 20 yard next and the 10 yard behind it.
| Size | Typical* | Tons included | Orders priced, 12 mo |
|---|---|---|---|
| 10 yard | $420 to $425* | 2 tons | 5 |
| 20 yard | $595 to $650* | 2 tons | 9 |
| 30 yard | $665 to $795* | 4 tons | 13 |
| 40 yard | $700 to $950* |
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
The From price is for a 30 yard. Other sizes are in the table.
A Columbus rental typically includes 7 days, with about 2 tons on a 10 yard or 20 yard and about 4 tons on a 30 yard.
Past the allowance, a ton on a Columbus 30 yard runs about $95*, and a day on a 30 yard runs about $20.
Columbus delivery varies by address, so the written quote lists any delivery charge on its own line, apart from the container rate.
Sizes
Columbus favors the 30 yard, with the 20 yard and 10 yard behind it and the 40 yard saved for the biggest clearouts.

In Columbus the 10 yard serves small household cleanouts, like the Reynoldsburg job below, and it typically includes about 2 tons.

Mid-size Columbus remodels use the 20 yard, which typically includes about 2 tons, so heavier tear-outs can reach the extra-ton charge sooner.

The 30 yard leads in Columbus and typically includes about 4 tons, double the allowance on a 20 yard, which is why contractors reach for it on larger jobs.

Big Columbus demolition and commercial clearouts step up to the 40 yard, which is ordered rarely here, and its range comes from all our jobs.
Recent work
Construction and demolition debris dominates Columbus work, with household cleanouts well behind it, and the busiest months run from late spring into summer.
Source: Dumpster Rental Dogs orders by delivery date. Job type comes from the debris material on the order. Customer names withheld.
Weight and disposal
Columbus construction debris now goes straight to the Franklin County Sanitary Landfill, since the Solid Waste Authority stopped taking it at its transfer stations on September 29, 2025.
| Topic | Rule |
|---|---|
| Construction and demolition debris goes straight to the landfill | Since September 29, 2025 the Solid Waste Authority of Central Ohio (SWACO) treats construction and demolition debris separately from municipal solid waste. It is no longer accepted at SWACO transfer stations and must go directly to the Franklin County Sanitary Landfill. Source |
| Items the Franklin County landfill refuses | SWACO lists these as not accepted: appliances with Freon, asbestos, hazardous waste, liquid waste including motor oil and water-based paint, lead acid batteries, TVs, computers and other electronics, whole or shredded tires, gas cylinders unless empty and delivered separately, and yard waste. Source |
| Yard waste | Ohio EPA says landfills may not accept mixed or source-separated yard waste except in limited cases under OAC Rule 3745-27-19(O). SWACO says dedicated loads of yard waste are banned from its landfill by state law. Source 1 Source 2 |
The Franklin County landfill refuses appliances with Freon, hazardous waste, liquids including motor oil, lead acid batteries, electronics, whole tires and yard waste.
Permits and rules
Columbus Public Service runs its Right-of-Way Permit Office at 111 N. Front St., and requests go in online at least three working days ahead.
| When | What you need | Lead time | Who to call |
|---|---|---|---|
| A dumpster or container placed in the public right of way (street, alley, sidewalk or tree lawn) | A 903 Right-of-Way Occupancy Permit, applied for online at portal.columbus.gov/permits. The city's rules say every dumpster or container in the right of way needs an occupancy permit, issued to the vendor who supplies it or to the person requesting it. A permit for a dumpster alone, not part of a larger construction project, is limited to 7 days unless approved in advance. A dumpster on a parking meter space is charged that meter's fee. Source 1 Source 2 | Submit requests at least 3 working days ahead | Department of Public Service, Right-of-Way Permit Office, 111 N. Front St., (614) 645-7497 |
| How a dumpster in the right of way must be marked | Reflective barricade tape on each dumpster, plus the company name and a 24-hour telephone number on each side where it is clearly visible. Source | Department of Public Service, Right-of-Way Permit Office |
Columbus's rules cover dumpsters in the public right of way. The pages we checked do not cover a container kept on private property.
Weather and season
22.0°F
Expect a January low near 22.0°F in Columbus, with roughly 103 nights a year at or below freezing. The final spring freeze is typically April 18, and the fall one arrives about October 27.
85.4°F
July highs average 85.4°F, and about 21 days a year reach 90°F or hotter, so Columbus summers run warm but not extreme.
4.67 in
July is also Columbus's wettest month at 4.67 inches, so loads sit heavier in summer and a driveway or paved pad beats a lawn edge.
June
June is Columbus's busiest month, with July and November not far behind.
January
January and September were the quietest months in Columbus.
Scheduling
From order to Columbus drop-off usually takes about four days, and only a minority of drops leave within a day.
When a Columbus 30 yard is full, the haul-off is a separate line* on the quote and sits outside the included 7 days.
Four days is the usual Columbus wait. For an earlier date, call (614) 604-9258 and ask what the next truck can handle.
Delivery area
Most deliveries land in Columbus itself, with some in Reynoldsburg and Delaware and the occasional drop in Westerville, Dublin and Hilliard.
Placement
Columbus requires a 903 Right-of-Way Occupancy Permit for a dumpster on a street, alley, sidewalk or tree lawn, and a permit for a dumpster alone is limited to 7 days.
The Columbus pages we checked cover the public right of way. They set no rule for a container kept on a driveway or private lot.
A Columbus street, alley, sidewalk or tree lawn takes a 903 occupancy permit, and a dumpster-only permit lasts 7 days unless approved otherwise. See permits
FAQs
These answers draw on our last 12 months of Columbus orders, the city right-of-way rules and the Solid Waste Authority pages linked above.
Columbus deliveries usually take about four days, and some run closer to a week, so book early when your job has a firm start date.
A driveway is the cleaner choice, since the city's permit pages cover the public right of way, not private property. A street, alley, sidewalk or tree lawn needs a permit.
Yes for the public right of way. Columbus issues a 903 Right-of-Way Occupancy Permit, applied for online at least 3 working days ahead, and the vendor or the customer can hold it.
Columbus rentals typically include 7 days, and finished jobs usually hold the box about five days. A dumpster-only street permit also stops at 7 days unless approved in advance.
A Columbus 10 yard and 20 yard each typically include about 2 tons, while a 30 yard includes about 4.
The Solid Waste Authority's landfill refuses appliances with Freon, hazardous waste, liquids, lead acid batteries, electronics, whole tires and yard waste.
Extra weight on a Columbus 30 yard typically costs about $95 a ton. Days beyond the included 7 run about $20 on that 30 yard. Net 30 and extended terms are available for qualified contractor and business accounts.
When the Columbus box fills, call for a haul-off. Finished jobs typically sit on site about five days before pickup.