
10 yard
The Dallas 10 yard is the compact box, usually includes about 2 tons, and suits small cleanups.

Contractors place most of our Dallas orders, and the 30 yard is the container they ask for most often.
From $685* for a 30 yard
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
Quote in 30 seconds · open to 7pm
Pricing
The 30 yard leads the Dallas table for general debris, followed by the 20 yard, with the 10 yard and the 40 yard ordered less often.
| Size | Typical* | Tons included | Orders priced, 12 mo |
|---|---|---|---|
| 10 yard | $465 to $495* | 2 tons | 10 |
| 20 yard | $620 to $670* | 2 tons | 34 |
| 30 yard | $685 to $885* | 4 tons | 54 |
| 40 yard | $745 to $805* | 4 tons | 8 |
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
The From price is for a 30 yard. Other sizes are in the table.
Dallas rentals include 14 days, and the weight allowance is about 4 tons on a 30 yard and about 2 tons on a 20 yard.
Extra tons on a Dallas 30 yard run about $89*, and extra days are about $20 on that 30 yard past the 4 tons and 14 days included.
Dallas delivery fees depend on the address, and they often land near $225 beside a 30 yard rate, so ask for yours with your quote.
Sizes
Dallas volume centers on the 30 yard, with the 20 yard well behind it and the 10 yard and 40 yard ordered only now and then.

The Dallas 10 yard is the compact box, usually includes about 2 tons, and suits small cleanups.

A Dallas 20 yard includes about 2 tons and is the usual pick for remodels and cleanouts, like the Richland Hills household job in May.

The 30 yard is the Dallas standard, usually carrying about 4 tons, and it covered jobs as different as a Frisco heavy-load haul and a Dallas job in March.

The Dallas 40 yard is kept for big projects, usually includes about 4 tons, and is ordered far less often than the 30 yard.
Recent work
Construction debris filled 97 of our 113 Dallas orders, with 7 household cleanouts and 1 heavy load of concrete or dirt, and the rest did not record a material.
Source: Dumpster Rental Dogs orders by delivery date. Job type comes from the debris material on the order. Customer names withheld.
Weight and disposal
Dallas's city landfill, McCommas Bluff, takes commercial loads Monday through Saturday and wants loose loads covered, while city brush and bulky pickup will not collect construction debris.
| Topic | Rule |
|---|---|
| City landfill | McCommas Bluff Landfill at 5100 Youngblood Road is open to commercial and residential customers, Monday to Friday 5 a.m. to 8 p.m. and Saturday 6 a.m. to 4 p.m., and closed Sunday. The state lists it as a Type I landfill, which can take all types of municipal solid waste. Source 1 Source 2 |
| Covered loads and restricted materials | Loads with loose material must be covered, and an uncovered load is charged a fee. The landfill's safety rules say restricted materials may not be disposed of in any portion of the landfill. Source 1 Source 2 |
| City collection does not take construction debris | Dallas's brush and bulky item collection does not take construction, demolition or remodeling debris, bricks, concrete or dirt, or tires, electronics and household chemicals. Household chemicals can go to the Dallas County Home Chemical Collection Center. Source |
McCommas Bluff bars restricted materials, so paint, chemicals and other hazardous items stay out of a Dallas dumpster.
Permits and rules
Dallas Right-of-Way Management, at 214-948-4290, handles traffic control permits, and only franchised haulers may legally run roll-offs for commercial, industrial and multi-family sites.
| When | What you need | Lead time | Who to call |
|---|---|---|---|
| A dumpster or roll-off parked on a Dallas street, sidewalk, alley or parkway | The city's tornado recovery guidance says dumpsters are not allowed to be parked in the City of Dallas right-of-way, so a Dallas container goes on the property itself. Source 1 Source 2 | City of Dallas Transportation and Public Works, Right-of-Way Management, 214-948-4290 | |
| Construction work, inside or outside the right-of-way, that closes a traffic lane or blocks a sidewalk or alley | A traffic control permit, with a traffic control plan submitted through the city's Right-of-Way Permit Management System. Source | City of Dallas Transportation and Public Works, Right-of-Way Management, 214-948-4290 | |
| A company that hauls roll-off containers or other solid waste for commercial, industrial or multi-family properties in Dallas | A non-exclusive franchise granted by the Dallas City Council. A company must hold a franchise to legally provide solid waste collection or hauling services in Dallas, and the Sanitation department keeps the list of authorized haulers. Source | City of Dallas Sanitation Services |
Dallas's right-of-way pages cover construction work and traffic control and do not say how to permit a container. The tornado recovery page is the one place that names dumpsters, and it says they are not allowed in the right-of-way. The city pages do not address a container kept on private property.
Weather and season
37.9°F
At Love Field the January low averages 37.9°F, and about 23 nights a year reach freezing. The last freeze lands around March 2, so cold snaps rarely linger past winter.
96.9°F
July runs hot, with a high near 96.9°F and about 108 days a year at 90°F or hotter. Plan loading for the early hours on those days.
4.79 in
October is the wettest month at 4.79 inches, with May close behind at 4.57. Heavy storms can soak a load, so cover it and keep the pad firm in spring and fall.
August
August is our busiest month in Dallas, with November right behind.
September
September is the quietest month, and the rest of the year stays fairly even.
Scheduling
Dallas drop-offs usually happen about two days after the order, and the slowest take about five.
A Dallas haul-off or swap for a 30 yard is quoted on its own line*, separate from the 14 days included.
A Dallas site that needs a box sooner than two days can call (469) 445-2999 to see what is open.
Delivery area
Dallas itself leads our deliveries, with Arlington next and a few each in Garland, Plano, Irving and Frisco.
Placement
Dallas says dumpsters are not allowed to be parked in its public right-of-way, so a Dallas container belongs on a driveway, lot or job site.
Many of our Dallas jobs are contractor sites and driveways in the suburbs, which sit on private property and outside the right-of-way.
Dallas says dumpsters are not allowed in its public right-of-way, so a street spot is not an option. See permits Lane, sidewalk or alley closures need a traffic control permit.
FAQs
Dallas answers below use typical metro order figures, the city's right-of-way pages and McCommas Bluff's landfill rules.
Dallas delivery usually takes about two days, with the slowest orders waiting about five.
Dallas says dumpsters are not allowed to be parked in the city right-of-way, so plan on a driveway, lot or job site.
Dallas does not allow dumpsters in its right-of-way, so the container goes on the property. Work that closes a lane, sidewalk or alley needs a traffic control permit, and Right-of-Way Management at 214-948-4290 can confirm how it applies.
Fourteen days come with a Dallas rental, and a typical finished job has the box on site for roughly 8 days.
Dallas allowances run about 2 tons on a 10 yard or 20 yard and about 4 tons on a 30 yard or 40 yard.
Dallas landfill rules bar restricted materials, and household chemicals have a separate drop-off at the Dallas County Home Chemical Collection Center, so keep paint and chemicals out of the box.
Dallas delivery fees vary by address and often run about $225 beside a 30 yard order, while extra tons are about $89 on that 30 yard. Your written quote lists every line item before you approve it.
Call when your Dallas load is full or the job wraps, and we set the pickup. Most rentals finish in about 8 days.