
20 yard
The Jacksonville 20 yard includes about 2 tons and handled the August roofing job as well as a household cleanout in St. Augustine.

Jacksonville jobs lean toward the 30 yard, but the 20 yard and the 40 yard are both common, and most orders come from contractors.
From $500* for a 30 yard
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
Quote in 30 seconds · open to 7pm
Pricing
The 30 yard and the 20 yard carry their own Jacksonville ranges for general debris, while the 40 yard uses the site-wide range marked with ¹.
| Size | Typical* | Tons included | Orders priced, 12 mo |
|---|---|---|---|
| 20 yard | $495 to $715* | 2 tons | 11 |
| 30 yard | $500 to $695* | 2 tons | 15 |
| 40 yard | $700 to $950* |
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
The From price is for a 30 yard. Other sizes are in the table.
Jacksonville rentals usually include about 14 days. Expect about 2 tons on a 30 yard or 20 yard, and about 5 tons on a 40 yard.
Each extra ton on a Jacksonville 30 yard is about $89*, and each extra day is about $15 on that 30 yard past the 2 tons and 14 days included.
A Jacksonville delivery fee, when listed, is usually about $87.50 and sits beside the 30 yard rate on your quote.
Sizes
Jacksonville splits its work across three sizes, the 30 yard, the 20 yard and the 40 yard, with the 30 yard ahead.

The Jacksonville 20 yard includes about 2 tons and handled the August roofing job as well as a household cleanout in St. Augustine.

The 30 yard is the Jacksonville leader, usually includes about 2 tons, and covered a July construction job that needed it for only a day.

A Jacksonville 40 yard carries about 5 tons, more than the smaller boxes, and is the choice when a job needs the most room.
Recent work
Construction debris filled 25 of our 32 Jacksonville orders, household cleanouts took 5, and roofing showed up once.
Source: Dumpster Rental Dogs orders by delivery date. Job type comes from the debris material on the order. Customer names withheld.
Weight and disposal
Jacksonville's city landfill, Trail Ridge in Baldwin, takes building materials Monday through Saturday, and Florida law keeps lead-acid batteries, used oil and whole tires out of landfills.
| Topic | Rule |
|---|---|
| City landfill | The city's landfill is Trail Ridge Landfill at 5110 U.S. Hwy 301 S in Baldwin, open Monday to Friday 6 a.m. to 7 p.m. and Saturday 6 a.m. to 1 p.m., and closed Sunday. The city's fee schedule lists building materials under regular waste. Source |
| Batteries, oil and tires | Florida law does not allow lead-acid batteries or used oil in landfills, and whole waste tires may not be deposited in a landfill. Source 1 Source 2 |
| Yard trash | Florida bars yard trash from lined Class I landfills, with an exception for landfills that collect landfill gas for beneficial use. Source |
Florida keeps lead-acid batteries, used oil and whole waste tires out of landfills, so none of them belong in a Jacksonville dumpster.
Permits and rules
Jacksonville's Development Services Review Group issues the Right of Way permit through JaxEPICS, and the contractor must have a bond on file first.
| When | What you need | Lead time | Who to call |
|---|---|---|---|
| A dumpster or other material placed on or in a Jacksonville city road, right-of-way or easement | A Right of Way permit under Section 744.110 of the Ordinance Code, submitted through the JaxEPICS system. The contractor must have a current Right of Way surety bond on file and an approved Maintenance of Traffic plan for any equipment storage that affects vehicle or pedestrian traffic. The permit must be on hand for inspection. Source | Most Right of Way permits are valid for six months, and the city inspector can grant a six month extension | Development Services Review Group, 214 N. Hogan St., Second Floor, 904-255-8310 |
| A container on a Florida Department of Transportation right-of-way, a private road or a private easement | The city says no city Right of Way permit is needed in those places. Its page does not say what the state requires on a state road. Source | Development Services Review Group |
Jacksonville's permitting page covers placing construction or other material in a city right-of-way and does not name dumpsters. It does not address a container kept on private property. The city lists permit fees on its separate City Fees page.
Weather and season
42.9°F
The January low at Jacksonville International averages 42.9°F, with only about 14 nights a year at freezing. The last freeze comes near February 25, and the first returns around December 7.
91.9°F
Jacksonville's summers are long, with July averaging 91.9°F and about 80 days a year at 90°F or hotter, so plan loading for the cooler hours.
7.60 in
June is the wettest month at 7.60 inches, and September is a hair behind. Downpours add real weight to an open load, and soft ground under a box is common, so tarp it and use pavement.
September
September is our busiest month in Jacksonville, with April and August close behind.
February
February and October are the quietest months for Jacksonville orders.
Scheduling
Jacksonville orders usually reach the site in about two days, and some wait about five.
A haul-off or swap on a Jacksonville 30 yard is priced separately*, outside the 14 days already included.
Need a Jacksonville box faster than two days? Call (904) 544-3880 and ask what is available.
Delivery area
Most Jacksonville deliveries stay in the city, with some in Middleburg, a few in Orange Park and the occasional drop in St. Augustine.
Placement
A Jacksonville container in a city road or right-of-way needs a Right of Way permit through JaxEPICS, with a bonded contractor and a traffic plan where traffic is affected.
A Jacksonville driveway or lot, from Orange Park to Middleburg, is private property outside the city's Right of Way permit.
A Jacksonville container in a city road or right-of-way needs a Right of Way permit and a bonded contractor. See permits Plan for a traffic plan if a lane or sidewalk is affected.
FAQs
Jacksonville answers below use typical metro order figures, Development Services' right-of-way page and the city landfill's published hours.
Most Jacksonville orders are on site within two days, though some take up to about five.
A Jacksonville driveway keeps the container on private property, which the city's permit page does not address. Anything in a city road or right-of-way needs a city Right of Way permit.
Jacksonville's Right of Way permit is submitted through JaxEPICS, needs a bonded contractor and a traffic plan, and is valid for six months. Call Development Services at 904-255-8310 with questions.
A Jacksonville rental usually includes about 14 days, and most jobs wrap up with the box on site for about 3 days.
A Jacksonville 30 yard or 20 yard usually includes about 2 tons, and a 40 yard about 5 tons.
Florida law keeps lead-acid batteries, used oil and whole waste tires out of landfills, so leave them out of a Jacksonville dumpster.
Jacksonville delivery fees run about $87.50 beside a 30 yard order, and extra tons are about $89 on that 30 yard. Your written quote lists every line item before you approve it.
Tell us when your Jacksonville job wraps and we schedule the pickup. Many rentals are done in about 3 days.