20 yard
A Tallahassee 20 yard suits mid-size construction work, and the August job in our records kept its 20 yard boxes on site for about a month.

Tallahassee orders lean toward the 30 yard for construction debris, homeowners order alongside contractors, and nearly every delivery lands in the city, led by the 32309 and 32304 zips.
From $600* for a 30 yard
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
Quote in 30 seconds · open to 7pm
Pricing
The Tallahassee 30 yard has its own range for general debris, while the 20 yard and 40 yard use the site-wide ranges marked with ¹, since local orders for those two are still few.
| Size | Typical* | Tons included | Orders priced, 12 mo |
|---|---|---|---|
| 20 yard | $525 to $695* | ||
| 30 yard | $600 to $675* | Up to 10 tons | 13 |
| 40 yard | $700 to $950* |
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
The From price is for a 30 yard. Other sizes are in the table.
Tallahassee rentals usually include about 15 days, and the 30 yard allowance ranged up to 10 tons on the orders we priced.
A Tallahassee 30 yard carries about $50* per extra ton on the orders we priced, and about $20 per extra day on that 30 yard.
Tallahassee delivery and pickup fees are itemized on your quote, next to the 30 yard rate, so nothing shows up later.
Sizes
Tallahassee work centers on the 30 yard, with the 20 yard and 40 yard covering smaller cleanups and larger demolition.

A Tallahassee 20 yard suits mid-size construction work, and the August job in our records kept its 20 yard boxes on site for about a month.

The 30 yard is the most common size for Tallahassee general debris, and most of the orders we priced for it included 10 tons, though some included less.

A 40 yard is an occasional Tallahassee box, kept for demolition or cleanup that needs the most room, and it uses the site-wide range.
Recent work
Construction and demolition debris filled 18 of our 22 Tallahassee orders, with 2 household cleanouts and 1 heavy load of dense material.
Source: Dumpster Rental Dogs orders by delivery date. Job type comes from the debris material on the order. Customer names withheld.
Weight and disposal
Leon County's disposal facility on Apalachee Parkway is open Monday to Saturday, and Florida Statute 403.708 keeps lead-acid batteries and used oil out of landfills.
| Topic | Rule |
|---|---|
| County disposal site | Leon County's Solid Waste Management Facility is at 7550 Apalachee Parkway and is open Monday to Saturday, 8 a.m. to 5 p.m. The county's rural waste service centers are limited to residents of unincorporated Leon County and exclude commercial entities, and the county says professionals can bring their waste to the Apalachee Parkway facility. Source 1 Source 2 |
| Items Florida keeps out of landfills | Under Florida Statute 403.708, a person who knows or should know what the waste is may not send lead-acid batteries, used oil or white goods to a landfill, and yard trash is restricted in lined Class I landfills. Source |
Florida keeps lead-acid batteries, used oil and white goods out of landfills, so none belong in a Tallahassee dumpster.
Permits and rules
Tallahassee's Traffic Engineering Section decides when a construction dumpster may sit in the right-of-way, under the city's Right-of-Way Management Manual.
| When | What you need | Lead time | Who to call |
|---|---|---|---|
| A construction dumpster placed in the City of Tallahassee right-of-way | The city's Right-of-Way Management Manual says placing construction dumpsters in the right-of-way is not permitted unless the city permits it, and sections 5.1.12 and 6.1.12 route that decision to the Traffic Engineering Section. The manual also bars storing materials in the right-of-way without a permit. Source | Traffic Engineering Section, Underground Utilities & Public Infrastructure, City of Tallahassee, City Hall 850-891-0000 | |
| A dumpster kept on private property, such as a driveway or job-site pad | The manual governs the public right-of-way and sets no rule for a container that stays on private property. Source | Traffic Engineering Section, City of Tallahassee |
Tallahassee's manual names construction dumpsters in sections 5.1.12 and 6.1.12 and states no permit fee or processing time for one. It covers the city right-of-way only, so a road outside the city limits falls under another agency.
Weather and season
40.5°F
January lows in Tallahassee average 40.5°F, and about 27 nights a year dip to freezing. Freezes wind down near March 11 and return around November 21.
92.1°F
July averages 92.1°F here, and about 103 days a year reach 90°F or hotter. Wet debris and shingles cook fast, so load early in the day.
7.76 in
June is the wettest month at 7.76 inches, with August close behind. Rain adds weight to an open load, so tarp the box and set it on pavement rather than soft lawn.
November
November is our busiest month in Tallahassee, with January and April next.
May
May, July and September were the quietest months for Tallahassee orders.
Scheduling
Tallahassee orders usually reach the site in about three days, and many arrive within a day.
A Tallahassee 30 yard swap or haul-off is priced separately*, beyond the 15 days already included.
Need a Tallahassee box sooner than three days? Call (850) 270-5298 and ask what is open.
Delivery area
Nearly every Tallahassee delivery stays inside the city, mostly in the 32309 and 32304 zips, with the occasional drop out in Quincy.
Placement
A Tallahassee construction dumpster in the public right-of-way is not allowed unless the city permits it through Traffic Engineering, so a driveway or job-site pad keeps things simple.
A Tallahassee driveway or job-site pad, from the 32309 zip out to Quincy, stays on private property outside the city manual's right-of-way rules.
A Tallahassee construction dumpster in the public right-of-way needs the city's permission through Traffic Engineering. See permits Line up a driveway or lot spot first.
FAQs
Tallahassee answers below draw on typical metro order figures, the city's right-of-way manual and Leon County's disposal hours.
Most Tallahassee orders are on site in about three days, and more than a third arrive within one day.
A Tallahassee driveway keeps the box on private property, which the city's manual does not address. A construction dumpster in the public right-of-way is not allowed unless the city permits it.
Tallahassee's Right-of-Way Management Manual routes dumpster permission to the Traffic Engineering Section. Call City Hall at 850-891-0000 and ask for Traffic Engineering before planning a street spot.
Tallahassee rentals include about 15 days, though the typical box goes back after about 6.
Most Tallahassee 30 yard orders we priced included 10 tons, though some included less. Your quote shows the exact allowance for your size and debris.
Florida law keeps lead-acid batteries, used oil and white goods out of landfills, so leave them out of a Tallahassee dumpster.
On the orders we priced, a Tallahassee 30 yard ran about $50 per extra ton and $20 per extra day. Your written quote lists every line item before you approve it.
Let us know when your Tallahassee job wraps, and we book the pickup. A typical box leaves after about 6 days.