
20 yard
Around Virginia Beach the 20 yard suits remodels, deck demolition and smaller cleanouts, and it typically includes about 3 tons, which is plenty for a kitchen gut.

Virginia Beach crews order the 30 yard and the 20 yard most, and a 2026 city rule now limits how long a roll-off can sit on a residential lot.
From $625* for a 30 yard
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
Quote in 30 seconds · open to 7pm
Pricing
Virginia Beach ranges below cover general debris. The 30 yard carries our From price and the 20 yard sits close behind, while the 40 yard range is typical across our jobs.
| Size | Typical* | Tons included | Orders priced, 12 mo |
|---|---|---|---|
| 20 yard | $565 to $595* | 3 tons | 13 |
| 30 yard | $625 to $695* | 4 tons | 12 |
| 40 yard | $700 to $950* |
*Prices vary with delivery address, container size, debris type, rental length, weight allowance and site access. Ranges shown are typical. Your written quote lists every line item before you approve it.
The From price is for a 30 yard. Other sizes are in the table.
Ten days come with a Virginia Beach rental, and the weight allowance is about 3 tons on a 20 yard or about 4 tons on a 30 yard.
Past the included weight, a 30 yard here typically adds about $90 a ton*, and each day beyond the included ten adds about $15 on that 30 yard.
Delivery to Virginia Beach, Norfolk or Chesapeake usually takes about two days, and the quote itemizes delivery and pickup so nothing arrives as a surprise.
Sizes
Virginia Beach orders split mostly between the 30 yard and the 20 yard, with the 40 yard saved for the occasional bulky clearout.

Around Virginia Beach the 20 yard suits remodels, deck demolition and smaller cleanouts, and it typically includes about 3 tons, which is plenty for a kitchen gut.

The 30 yard does most of the heavy lifting in Virginia Beach and Chesapeake, mainly on roofing and construction debris, and it typically includes about 4 tons.

The 40 yard turns up now and then for bulky loads such as a Chesapeake yard debris clearout, and it typically includes about 5 tons.
Recent work
Construction and demolition debris leads Virginia Beach work, household cleanouts come a distant second, and April is our busiest month with June close behind.
Source: Dumpster Rental Dogs orders by delivery date. Job type comes from the debris material on the order. Customer names withheld.
Weight and disposal
The regional landfill serving Virginia Beach, run by the Southeastern Public Service Authority in Suffolk, takes construction and demolition debris but refuses friable asbestos, lead acid batteries, free liquids and hazardous waste.
| Topic | Rule |
|---|---|
| Where Virginia Beach construction debris goes | The Southeastern Public Service Authority (SPSA), which serves Virginia Beach, Norfolk, Chesapeake and the other member localities, runs the Regional Landfill at 1 Bob Foeller Drive in Suffolk. It accepts municipal solid waste, construction and demolition debris, soils and clean fill, and does not accept disaster waste. Source |
| What the Regional Landfill refuses | The Regional Landfill may not receive materials containing friable asbestos, lead acid batteries, free liquids, drums that are not empty and cleaned, large animal carcasses, cable or rope over 6 feet long, or rigid items over 6 feet long such as pipe, timber and metal stock. Regulated hazardous and medical wastes are not accepted. Source |
| Shingles, concrete and tires | SPSA lists shingles as accepted at its transfer stations, with asbestos shingles taken only at the Regional Landfill by appointment. Large loads of broken concrete can go to the Regional Landfill. Tires are handled separately at the SPSA Tire Processing Facility at the Regional Landfill. Source |
Virginia Beach loads headed for the regional landfill cannot include friable asbestos, lead acid batteries, free liquids, hazardous or medical waste, or rigid items over 6 feet long.
Permits and rules
Civil Inspections at 2403 Courthouse Drive handles Virginia Beach right-of-way permits, and the Zoning Division enforces the roll-off rule on residential lots.
| When | What you need | Lead time | Who to call |
|---|---|---|---|
| A dumpster in a street, curb lane or sidewalk, or any other City-owned right of way | A Utility/Right of Way Permit from the Development Services Center, which issues permits for work in public rights-of-way and easements. The city's right-of-way page does not name dumpsters, so confirm with Civil Inspections that a street-side container falls under this permit before you order. Source 1 Source 2 | Civil Inspections, 2403 Courthouse Drive, 757-385-4558. Permits & Inspections, 757-385-4211, perminsp@vbgov.com | |
| Construction work that closes a sidewalk or lane in the oceanfront or Sandbridge areas, May 1 to September 30 | Construction activity that involves sidewalk or lane closures is not permitted there in those months. The Director of Public Works may approve a variance on a written request. The page does not name dumpsters, so ask Civil Inspections before planning a street-side container in those areas. Source | Department of Public Works, Traffic Engineering division, through Civil Inspections at 757-385-4558 | |
| A roll-off dumpster on a lot in a residential zoning district | Section 208.1 of the Zoning Ordinance allows one roll off container for up to 30 days in any consecutive 6-month period. During permitted construction, reconstruction, alteration or renovation it may stay for the life of the active building permit plus 24 hours before and after. The container must also comply with Chapter 31, Solid Waste, of the City Code. Violations carry civil penalties enforced by the Zoning Division. The section sets no permit or fee for the container. Source 1 Source 2 | City of Virginia Beach Zoning Division, Planning Department |
Section 208.1 was added by Ordinance 3843 on April 21, 2026. The right-of-way page does not state a permit fee for dumpsters, so none is listed.
Weather and season
33.6°F
Virginia Beach winters are mild, with a January low of 33.6°F and about 41 nights a year at freezing. Spring freezes tend to end near March 17, and the first frost of fall returns around November 23.
89.4°F
July highs reach 89.4°F, and about 36 days a year hit 90°F or hotter, so an early start on loading beats the afternoon heat.
6.08 in
July is the wettest month at 6.08 inches, with August and September close behind. Rain adds weight to roofing debris and softens lawns, so set the box on pavement.
April
April is our busiest month around Virginia Beach, and June is not far behind.
March
March and September were our quietest months in Virginia Beach, with January and October also slow.
Scheduling
From order to drop-off in Virginia Beach usually runs about two days, and some jobs stretch to four, so book early for a hard start.
When a 30 yard fills before the job ends, ask us about a swap or haul-off, which is priced as its own line*.
Need a Virginia Beach box faster than the usual two days? Call (804) 655-6508 and ask what is open on the schedule.
Delivery area
Most deliveries land in Virginia Beach and Norfolk, with some in Chesapeake and the occasional drop in Hampton, and zips 23321, 23322, 23451 and 23518 show up most often.
Placement
A Virginia Beach street, curb lane or sidewalk placement goes through the Utility/Right of Way Permit, while a residential lot falls under Section 208.1, which allows one roll-off for up to 30 days in six months.
In a Virginia Beach residential district, Section 208.1 allows one roll-off for up to 30 days in six months, or the life of an active building permit.
A street, curb lane or sidewalk in Virginia Beach falls under a Utility/Right of Way Permit from Civil Inspections, and the oceanfront and Sandbridge have seasonal limits. See permits
FAQs
These answers draw on our last 12 months of Virginia Beach area orders, the city's permit and zoning pages, and the regional landfill rules linked above.
Virginia Beach deliveries usually take about two days, and some stretch to four, though nearly half arrive within a day, so call early when your start date is firm.
A driveway or lot keeps you clear of right-of-way permitting, but in a residential district Section 208.1 allows one roll-off for 30 days in six months, longer under an active building permit.
For a street or sidewalk, ask Civil Inspections at 757-385-4558 about a Utility/Right of Way Permit, since the city page does not name dumpsters. Construction closures of a sidewalk or lane at the oceanfront and Sandbridge are barred May 1 to September 30.
A Virginia Beach rental typically includes 10 days, and finished jobs often hold the box about two weeks, though a few run past three weeks.
A Virginia Beach 20 yard typically includes about 3 tons, a 30 yard about 4 tons and a 40 yard about 5 tons.
The regional landfill refuses friable asbestos, lead acid batteries, free liquids, hazardous and medical waste, and rigid items over 6 feet long. Tires go to a separate tire facility run by the Southeastern Public Service Authority.
Extra weight on a Virginia Beach 30 yard typically runs about $90 a ton, and a day past the included 10 on that 30 yard runs about $15. Net 30 and extended terms are available for qualified contractor and business accounts.
Call when the box is full and ask for the next open pickup day. Finished Virginia Beach jobs typically hold the container about two weeks.